NF C93-140-2-2011 ESL测量方法.第2部分:电子设备用表面安装电容器.

作者:标准资料网 时间:2024-05-23 20:37:26   浏览:9974   来源:标准资料网
下载地址: 点击此处下载
【英文标准名称】:ESLmeasuringmethod-Part2:surfacemountcapacitorsforuseinelectronicequipment.
【原文标准名称】:ESL测量方法.第2部分:电子设备用表面安装电容器.
【标准号】:NFC93-140-2-2011
【标准状态】:现行
【国别】:法国
【发布日期】:2011-01-01
【实施或试行日期】:2011-01-22
【发布单位】:法国标准化协会(FR-AFNOR)
【起草单位】:
【标准类型】:()
【标准水平】:()
【中文主题词】:
【英文主题词】:Capacitors;Chips;Definitions;Electricalengineering;Electronicengineering;Electronicequipmentandcomponents;Fixedcapacitors;Impedance;Impedancemeasurement;Inductance;Measurement;Measuringtechniques;SMD;Specification(approval);Surfacemounting;Testing
【摘要】:
【中国标准分类号】:
【国际标准分类号】:31_060_10
【页数】:17P;A4
【正文语种】:其他


下载地址: 点击此处下载
基本信息
标准名称:漏电保护器安装和运行
英文名称:Installation and operation of residual current operated protective devices
中标分类: 电工 >> 电工综合 >> 卫生、安全、劳动保护
ICS分类: 电气工程 >> 电工器件 >> 熔断器和其他过载保护
替代情况:被GB 13955-2005代替
发布部门:国家技术监督局
发布日期:1992-12-19
实施日期:1993-05-01
首发日期:1992-12-19
作废日期:2005-12-01
归口单位:国家质量监督检验检疫总局
起草单位:北京供电局
出版日期:1900-01-01
页数:14
适用范围

本标准规定了正确选择、安装、使用电流动作型漏电保护器及其运行管理工作的有关要求。本标准适用于工作电压为交流50Hz、220/380V电源中性点直接接地的供用电系统。

前言

没有内容

目录

没有内容

引用标准

没有内容

所属分类: 电工 电工综合 卫生 安全 劳动保护 电气工程 电工器件 熔断器和其他过载保护
Product Code:SAE AIR4276
Title:Computerization of Reliability, Maintainability and Supportability (Rm&S) in Design
Issuing Committee:G-11 Reliability Maint Support And Probabilistic Methods
Scope:This Aerospace Information Report (AIR) is the primary vehicle for providing the survey results to industry and government.The Institute of Defense Analysis (IDA), has performed a study which concludes that computerized techniques must be developed to integrate RM&S into product design in order to permit design influence from inception throughout the product life cycle. This AIR addresses the DoD initiative for developing Computer Aided Acquisition and Logistic Support (CALS) and industry's role in its evolution. AIR 4276 provides the detailed results of an industry/government survey inquiring into the extent of computerization of RM&S into the design process. Background information describes the evolution of the survey and why it was developed. The results provide demographic information about the respondents, the existence and extent of their CALS policy and plans, the priority placed on each RM&S task, and the extent to which these tasks have been computerized into the design process. Recommendations based on the survey results are included.